FINAL REPORT OF THE PROJECT Emergency Preparedness and Post-emergency Recovery

Funded by: Irish Aid Grant, Irish Embassy

Location of Project: Quang Binh and Quang Tri provinces

Duration: 30/11/2013 – 30/6/2014

23. Trường TH Vinh Tu trước sửa chữa

 

 

 

 

 

 

 

 

 

truong tieu hôc vinh tu

Table of Contents

Page

  1. INTRODUCTION..2
  2. PROJECT DESIGN. 2
  3. ACTIVITIES AND OUTPUTS. 3

3.1. Selection of targeted area and beneficiaries. 3

3.2. Set up management system. 3

3.3.  Rehabilitation of schools and provision of teaching facilities. 4

3.3.1. Implementing procedure. 4

3.3.2. Selection of construction companies by bidding. 4

3.4. Results/output of rehabilitation activity. 6

3.5.  Capacity building. 7

  1. PROJECT EFFECT. 8
  2. PROJECT SUSTAINABILITY.. 8
  3. LESSONS LEARNT. 8
  4. CONCLUSION AND RECOMMENDATION.. 9

7.1. Conclusion. 9

7.2. Recommendation. 9

APPENDIX.. 10

Download now:
Completion report of Project IA in QB and QT 2014 (final)

 


Jaxx Wallet

proda login

wordpad download online

wordpad download

Atomic Wallet

Jaxx Wallet Download

Atomic Wallet Download

Atomic Wallet App

atomicwalletapp.com

Trending Dance

">